Hivelocity, the datacenter that houses the Host 12 server, will be replacing a power distribution unit as a preventative measure to eliminate the risk of an unexpected PDU failure.
Maintenance Details:
Date: September 23, 2026
Time: 4:00 AM to 5:00 AM Eastern Time
Duration: Approximately 1 hour
During this maintenance window, the PDU will be taken out of service and replaced.
All equipment connected to the affected PDU will lose power during the replacement. Service interruption for affected equipment is expected and unavoidable during this maintenance.
Host12 will be gracefully shut down 15 minutes before the PDU maintenance starts.
Once the replacement PDU has been installed and verified, equipment will be connected to the new PDU and power restored.
Please direct any questions regarding this maintenance to support@vervehosting.com